A moisture meter held against an interior wall during a mid-term inspection

Specimen · What You Receive

Sample inspection report.

An illustrative mid-term inspection on a two-bedroom terrace, in the exact format and order you receive. The wording is real; the property, tenant and photographs are not.

Page One

The visit, in six lines.

Specimen · Mid-term inspection · visit 2 of 4

Property
Two-bedroom mid-terrace, tenanted · address withheld
Document
Mid-term inspection · visit 2 of 4
Interval
Quarterly, agreed with the managing branch
Access
Tenant present · 24 hours' written notice given
Weather
Dry, 12°C — relevant to the condensation readings below
Next visit due
In three months

Section 1 · Flagged

What needs a decision.

Always first, always the shortest section. Three items on this visit, in the order we would deal with them.

F.01Act now

Bathroom extractor fan not operating

Switch operates the light but the fan does not run. Tenant reports it has not worked since they moved in and was not reported. Condensation and early surface mould recorded in the bathroom and in Bedroom 2 (see R.04, R.09), which is consistent with a bathroom that cannot vent.

Electrician to attend. Re-inspect the mould once ventilation is restored.

F.02Act now

Smoke alarm, landing — no response on test

Alarm present and correctly sited. Test button pressed twice, no sound. Battery type not accessible without removing the unit, which was not done.

Replace or repair. This is a legal requirement on each storey.

F.03Worth doing

Kitchen sink base unit — slow leak

Damp staining and softening to the base board beneath the sink trap. No standing water at the time of the visit. Cupboard contents dry.

Plumber to check the trap seal before the board fails.

Section 2 · The Record

Room by room, against the last visit.

Only rows marked Changed need reading. Everything else is confirmation that it was looked at.

R.01HallwayWalls, ceiling and floor as previous visit. Smoke alarm — see F.02.As before
R.04BathroomSurface mould to the ceiling above the shower and to the window reveal, approx 300mm × 200mm. Surface reading elevated. No staining to the ceiling below.Changed
R.06KitchenWorktop, units and appliances as previous visit. Base unit beneath sink — see F.03.Changed
R.08Bedroom 1As previous visit. Window opens and closes, trickle vent open.As before
R.09Bedroom 2Light surface mould to the external wall corner behind the wardrobe, approx 150mm. Trickle vent closed. Recorded, not diagnosed.Changed
R.12Garden & exteriorGrass cut, no accumulation of waste. Gutter above the rear door discharging correctly on the day.As before

Abridged: a full report covers every room, the loft, the exterior and the services. Damp and mould are recorded here and diagnosed by The Damp & Mould Man, not by us.

Section 3 · The Interval

Where this visit sits.

The interval · 12-month tenancy, quarterly

  1. Month 0Check-in
  2. Month 3Inspection
  3. Month 6InspectionNext
  4. Month 9Inspection
  5. Month 12Check-out

Every report we send carries the date of the next visit. That is the whole product: a property that gets looked at on time, and a file that is never out of date when someone asks for it.

Every Report

What is always in it.

Flagged items first

A branch manager reads the top of page one and knows what needs a decision today. The routine record follows underneath.

Every finding photographed

Each reference is a dated, exhibit-numbered photograph in the appendix. Withheld on this specimen; present on yours.

Recorded, not diagnosed

We say where the mould is, how big it is and what the reading was. We do not say what is causing it — that is a separate job.

The next date, on the front

Every report carries the next visit date, so the file is never quietly out of date.

Why there are no photographs here

Real reports contain real homes and real tenants. We do not publish client documents, redacted or otherwise. If you want to see a complete report before booking, ask and we will walk you through one on a call.

Book an inspection.

One property or a whole managed list. Written price within 24 hours.